1. Engineering Surveys

Waste Survey
The waste survey was conducted to ascertain the actual waste generation characteristics in each municipality and to assess the percentage of compostable, recyclable and inerts in the municipal waste.
 
“Scientific Research Laboratory” was selected as this agency had wide experience for waste sampling and analyses in this region, and also, they were very familiar with the targeted municipalities.

The survey was conducted by collection of waste from different landuse types of the municipalities in consultation with the concerned Sanitary Inspectors (SIs) of the municipalities.
 
The Waste survey was conducted between Dec 2007 and Jan 2008. After analyzing the data collected through this survey a Waste Survey Report was submitted for all six municipalities which was utilized for preparation of the Design Reports.



Topographical Survey

Topographic Survey was conducted to determine the actual boundary of the proposed sites, the topography of the sites especially in terms of selected long and cross profiles and determination of values of TTS and TBM. “Softa Computer” was determined as the surveyor and they initiated the surveys from the mid of February 2008. The survey team has completed their survey for the six municipal sites and submitted their Report with drawings which were utilized for the Design Reports.

Soil Investigations
The objective of the investigations was to ascertain the sub-soil geotechnical properties and profile in order to design and plan most suitable type of foundations for the structures envisaged.“Sengupta Engineering Services” were determined as the surveyors for soil investigation and they initiated the surveys from mid of February 08.  The survey team has already completed their survey for the six municipal sites and submitted their Reports which were utilised for the Design Reports.


Septic Tank Sludge and Canal Water Survey

The project envisages discharging surface runoff, treated leachate from the landfill and the treated effluent from the septic tank sludge treatment plant planned at the RWMC into the Dankuni Canal – Baidyabati Khal – Hooghly River System. As such it was felt necessary to evaluate the chemical and biological quality of the septic tank sludge generated in the municipalities and also that of the water in the abovementioned canal system. The survey was accordingly commissioned in the last week of February 2008 and the survey agency (Scientific Research Laboratory) has completed their surveys and submitted their Analysis Report which was utilised for the Design Reports.

2. Preparation of Design documents

Documents prepared by the PMC

Pkg 1: Primary Collection, Secondary Transport and Drain Cleaning

 - Draft Basic Design Report (BDR) for Pkg 1 : Primary Collection, Secondary Transport and Drain Cleaning

 - Draft BDR for Pkg 1 : (First Revision) – After incorporation of comments from the PMU

 - Final BDR for Pkg 1 : (Second Revision) – After incorporation of comments from the municipalities
  
(Finalised through a Joint Workshop between PMU, Six Participating Municipalities and PMC)

 - Draft Basic Design Report (BDR) for Pkg 1 B: Secondary Collection Points (SCPs)

 - Draft BDR for Pkg 1 B: SCPs (First Revision) – After incorporation of comments from the PMU

 - Final BDR for Pkg 1 B: SCPs (Second Revision) – After incorporation of comments from the municipalities
   (Finalised through Joint Field Survey of SCPs by PMU, Municipalities and PMC)

Pkg 2: Transfer Station and Compost Plants

 - Draft Basic Design Report (BDR) for Pkg 2: Transfer Station & Compost Plants (TS & CP)

 - Final BDR for Pkg 2: TS & CP (First Revision) - After incorporation of comments from the PMU

 Pkg 3: Regional Waste Management Center

 - Draft Basic Design Report (BDR)  for Pkg 3: Regional Waste Management Center (RWMC)

 - Draft BDR for Pkg 3: RWMC (First Revision) - After incorporation of comments from the PMU

 - Draft BDR for Pkg 3: RWMC  (Second Revision) - After incorporation of further comments from the PMU

 - Final BDR for Pkg 3: RWMC  (Third Revision) - Incorporating WBPCB stipulations (as part of Env. Clearance)

Pkg 4: Heavy Equipments, Transfer / Haul Vehicles and Containers

 - Draft Basic Design Report (BDR)  for Pkg 4: Heavy Equipment , Haul Vehicles & Containers – Comments awaited from PMU

Pkg 5: Improvement of Access Roads

 - Draft Basic Design Report (BDR)  for Pkg 5: Improvement of Access Roads

 - Final BDR for Pkg 5: Improvement of Access Roads (First Revision) - After incorporation of comments from the PMU

3. Preparation of Tender documents

Documents prepared by the PMC

 Pkg 1: Primary Collection, Secondary Transport and Drain Cleaning

- Draft Tender Document for Demonstrative Phase

 - Final Tender Document for Demonstrative Phase (1st Call) (First Revision) – After incorporation of comments from the PMU

 - Final Tender Document for Demonstrative Phase (2nd Call) (Second Revision) – After incorporation of comments from the PMU

 - Draft Tender Document for Pkg 1 : Main Phase

 - Final Tender Document for Pkg 1 : Main Phase (First Revision) – After incorporation of comments from the PMU

 - Draft Tender Document for Pkg 1B : Secondary Collection Points (SCPs)

 - Final Tender Document for Pkg 1B : SCPs (First Revision) – After incorporation of comments from the PMU

Pkg 2: Transfer Station and Compost Plants

 - Draft Prequalification Document for Pkg 2

 - Final Prequalification Document for Pkg 2 (First Revision) – After incorporation of comments from the PMU

 - Draft Tender Document for Pkg 2

 - Final Tender Document for Pkg 2 (First Revision) – After incorporation of comments from the PMU

Pkg 3: Regional Waste Management Center

- Draft Prequalification Document for Pkg 3

 - Final Prequalification Document for Pkg 3 (First Revision) – After incorporation of comments from the PMU

 - Draft Tender Document for Pkg 3

 - Final Tender Document for Pkg 3 (First Revision) – After incorporation of comments from the PMU

 - Draft Bid Document for Pkg 3 with Must Conditions

 - Draft Bid Document for Pkg 3 with Must Conditions (First Revision) – After incorporation of comments from the PMU & JICA

4. Tendering

Pkg 1: Primary Collection, Secondary Transport and Drain Cleaning

- Tender call for Demonstrative Phase on April 11, 2008 (First Call) and then on May 2, 2008 (Second Call)

-
Selection of Successful Bidder for Demonstrative Phase Tender – M/s Sheetal Group of Companies in May 2008.

- Tender call for Main Phase on Dec 16, 2008

- Selection of Successful Bidder for Main Phase Tender – M/s Sintex Industries Ltd. in March 2009.

- Tender call for Package 1B: Secondary Collection Points on Jan 30, 2010

- Selection of Successful Bidder for Package 1B Tender – M/s P. S. Industries Ltd. in April 2010

Pkg 2: Transfer Station and Compost Plants

- Notice Inviting Pre-Qualification for Pkg 2 -September 12,2008

- Submissions of Completed Applications for Pre-Qualification for Pkg 2 - October 24,2008

- Completion of the Pre-Qualification Process for Pkg 2 after concurrence on the same from JICA – April 22, 2009

- Issue of Tender Documents to Pre-Qualified Bidders - April 27, 2009

- Close of Tender for Pkg 2 – June 26, 2009

- Completion of the Technical Evaluation for Pkg 2 after concurrence on the same from JICA – Nov 21, 2009

- Financial Bid Opening in presence of Technically Qualified Bidders – Nov 27, 2009

- Completion of the Financial Evaluation for Pkg 2 after concurrence on the same from JICA – Feb 28, 2010

- The Contract concluded with the Selected Bidder – M/s Jamshedpur Utilities & Services Company Limited (JUSCO) in March 2010.

Pkg 3: Regional Waste Management Center

- Notice Inviting Pre-Qualification for Pkg 3 on September 12,2008

- Submissions of Completed Applications for Pre-Qualification for Pkg 3 - October 24,2008

- Completion of the Pre-Qualification Process for Pkg 3 after concurrence on the same from JICA – April 22, 2009

- Issue of Tender Documents to Pre-Qualified Bidders – May 04, 2009

- Close of Tender for Pkg 3 – July 31, 2009

- Submission of Technical Evaluation Report for Pkg 3 to JICA – Sep 24, 2009

- Request from JICA for Re-tendering for Pkg 3 – Nov 24, 2009

- Bidding Documents with Must Conditions for Pkg 3 finalised after concurrence on the same from JICA and NIT published on 31st March 2010

- Close of Tender for Pkg 3 – May 31, 2010

- Publication of the result of Part-I “Must Condition” Evaluation – June 02, 2010

- Completion of the Technical Evaluation for Pkg 3 after concurrence on the same from JICA – July 28, 2010

- Financial Bid Opening in presence of Technically Qualified Bidders – August 02, 2010

- Completion of the Financial Evaluation for Pkg 3 after concurrence on the same from JICA – August 12, 2010

- Contract concluded with the Selected Bidder – M/s SMS Infrastructure Limited (SMS) in September 2010.

5. Implementation

Pkg 1: Primary Collection, Secondary Transport and Drain Cleaning

- M/s Sheetal Group of Companies was selected as supplier for Demonstrative Phase and supply of household bins and primary collection equipments to the selected wards in all six municipalities was completed by November 2008.

- M/s Sintex Industries Ltd. was selected as supplier for Main Phase and phased supply of primary and secondary collection equipments to all six municipalities has started from July 2009.

- M/s PS Engineering has been selected as the Contractor and work for construction of SCPs has started from April 2010.

Pkg 2: Transfer Station and Compost Plants

- M/s Jamshedpur Utilities & Services Company Limited (JUSCO) has been selected as the Contractor and work for construction of the T/S&CPs has started from April 2010.

Pkg 3: Regional Waste Management Center

- M/s SMS Infrastructure Limited (SMS) has been selected as the Contractor and work for construction of the RWMC has started from Nov 2010.

 
 
       
   